NOUS72 KNCF 061300 FROM - AWIPS/NCF TO - ALL SUBJECT - GOES-17 (GOES-West) ABI Cooling Timeline Mode 3 Test TEST INFORMATION - Impact(s): GOES-17 ABI Imagery and Level 2 Products - Start Time: December 10, 2019 1800Z - Expected End: December 11, 2019 2000Z - Event Duration: Two 2-hour events (1800Z -to- 2000Z) TEST DESCRIPTION On Tuesday December 10, 2019 and Wednesday December 11, 2019, NESDIS will conduct two hours (1800-2000 UTC each day) of a GOES-17 ABI cooling timeline test using Mode-3. This test is planned to investigate the ground system throughput for L2 algorithms. The test will be a variation of Mode 3 (“Flex Mode” uploaded as timelineID=3) where GOES-17 ABI will generate a single full disk once per 15 minutes and a single mesoscale domain sector once per 1 minute. The CONUS domain and usual second mesoscale domain sector will not be scanned during the timeline as those periods will be used for cooling. Product availability will occur every 15 minutes with timestamps of HH:05, HH:20, HH:35, and HH:50 (with HH:05 representing data collected from HH:50 through HH:05 and HH:20 representing data collected from HH:05 through HH:20, etc.) for each hour from 1800-2000 UTC on December 10 and 11. GOES-17 ABI will return to nominal Mode 6 operations including the ability to make two mesoscale domain sector requests at 2000 UTC on each of the two days. INR and radiometric calibration will be maintained throughout the data outage. This test will be postponed in the event of Critical Weather Day declaration over the test period. The test will slip one business day at a time until it does not conflict with CWD declaration. These test activities are specific to ABI. All other GOES-17 spacecraft and instrument (EXIS, GLM, Magnetometer, SEISS, SUVI) activities will remain nominal for the duration of these tests. Questions/Information requests - contact ESPC Operations at ESPCOperations@noaa.gov or 301-817-3880 NCF/ZZZ